Horizontal, Three Pass, Fully Wet Back Smoke Tube Steam Boiler
HRU Option: APH/WPH
Draught: Induced / Balanced
Fuel: Solid / Biomass
Fuel Feeding: Manual/Auto
Grate: Plain / Nozzle Bed
Evaporation - 0.5 TPH to 5 TPH
Working Pressure - upto 17.5 kgs./cm² (g)